Total Business Solution
PLN Indonesia power’s core business is the provider of energy solution including the supply and project development of various stations across Indonesia.
See MoreSERVICES AND
Product
IPMS (Indonesia Power Maintenance Services), is a Maintenance Repair Overhaul Product Brand from PT PLN Indonesia Power Maintenance Business Unit for customers outside PLN Group and supports Beyond kWH business.
Maintenance, Repair & Overhaul (MRO)
Comprehensive services for maintenance, repair, and overhaul of power plant equipment
Low Speed Balancing
Precision balancing services for low-speed equipment with high accuracy
Rewinding & Reinsulation
Rewinding and reinsulation services for motors and generators with premium quality
Assessment & RLA
Comprehensive assessment and Remaining Life Assessment (RLA) services to predict equipment remaining life
Special Tools
Specialized tools and equipment for power plant maintenance
Other Services
Additional maintenance and repair services to support specific needs
Our Certifications
IPMS holds internationally recognized certifications that demonstrate our commitment to quality and excellence:
- Electric Power Competency Certification covering New and Extension Certifications for Operation and Maintenance
- General OHS Expert Certification
- Vibration Category II Certification
- Corrosion Inspector Certification
- Welder Certification
- Firefighter Officer Certification
- First Aid Officer Certification (P3K)
- Fitter Certification • NDT (Non-Destructive Testing) Certification
- Boiler Inspector Certification
- Welding Engineering Certification
- Welding Inspector Certification
These certifications reflect our dedication to maintaining the highest standards in power plant maintenance services.
OUR SUCCESSFULL
Project
MRO experience in number
LASTEST
News
IPMS Successfully Completes Major Turbine Overhaul at Suralaya Power Plant
Indonesia Power Maintenance Service (IPMS) has successfully completed a comprehensive turbine overhaul project at the Suralaya Power Plant in Banten. The project, which lasted three months, involved complete disassembly, inspection, and reassembly of the 600MW turbine unit.
"This project showcases our technical expertise and commitment to maintaining Indonesia's critical power infrastructure," said our Chief Technical Officer. "Our team worked around the clock to ensure minimal downtime while maintaining the highest safety and quality standards."
The overhaul included precision balancing, blade inspection and replacement, bearing refurbishment, and comprehensive testing to ensure optimal performance. The turbine is now expected to operate efficiently for another 5-7
Read More
Our Clients
No partners to display at the moment.